How Mid-South Metallurgical cut Energy Use by 22%

Mid-South in Murfreesboro, Tennessee operates a high-energy plant providing precision heat treatments for high-speed tools – and also metal annealing and straightening services. This was a great business to be in before the energy crisis struck. That was about the same time the 2009 recession arrived. In no time at all the market was down 30%.

Investors had a pile of capital sunk into Mid-South?s three facilities spread across 21,000 square feet (2,000 square meters) of enclosed space. Within them, a number of twenty-five horsepower compressors plus a variety of electric, vacuum and atmospheric furnaces pumped out heat 27/7, 52 weeks a year. After the company called in the U.S. Department of Energy for assistance, several possibilities presented.

Insulate the Barium Chloride Salt Baths

The barium chloride salt baths used in the heat treatment process and operating at 1600?F (870?C) were a natural choice, since they could not be cooled below 1200?F (650?C) when out of use without hardening the barium chloride and clogging up the system. The amount of energy taken to prevent this came down considerably after they covered and insulated them. The recurring annual electricity saving was $53,000.

Manage Electrical Demand & Power

The utility delivers 480 volts of power to the three plants that between them consume between 825- and 875-kilowatt hours depending on the season. Prior to the energy crisis Mid-South Metallurgical regarded this level of consumption as a given. Following on the Department of Energy survey the company replaced the laminar flow burner tips with cyclonic burner ones, and implemented a number of other modifications to enhance thermal efficiency further. The overall natural gas reduction was 20%.

Implement Large Scale Site Lighting Upgrade

The 24/7 nature of the business makes lighting costs a significant factor. Prior to the energy upgrade this came from 44 older-type 400-watt metal halide fixtures. By replacing these with 88 x 8-foot (2.5 meter) fluorescent fittings Mid-South lowered maintenance and operating costs by 52%

The Mid-South Metallurgical Trophy Cabinet

These three improvements cut energy use by 22%, reduced peak electrical demand by 21% and brought total energy costs down 18%. Mid-South continues to monitor energy consumption at each strategic point, as it continues to seek out even greater energy efficiency in conjunction with its people.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Check our similar posts

Disaster Recovery

Because information technology is now integrated in most businesses, a business continuity plan (BCP) cannot be complete without a corresponding disaster recovery plan (DRP). While a BCP encompasses everything needed – personnel, facilities, communications, processes and IT infrastructure – for a continuous delivery of products and services, a DRP is more focused on the IT aspects of the plan.

If you’re still not sure how big an impact loss of data can have, it’s time you pondered on the survival statistics of companies that incurred data losses after getting hit by a major disaster: 46% never recovered and 51% eventually folded after only two years.

Realising how damaging data loss can be to their entire business, most large enterprises allocate no less than 2% of their IT budget to disaster recovery planning. Those with more sensitive data apportion twice more than that.

A sound disaster recovery plan is hinged on the principles of business continuity. As such, our DRP (Disaster Recovery Plan) blueprints are aimed at getting your IT system up and running in no time. Here’s what we can do for you:

  • Since the number one turn-off against BCPs and DRPs are their price tags, we’ll make a thorough and realistic assessment of possible risks to determine what specific methods need to be applied to your organisation and make sure you don’t spend more than you should.
  • Provide an option for virtualisation to enjoy substantial savings on disaster recovery costs.
  • Provide various backup options and suggest schedules and practices most suitable for your daily transactions.
  • Offer data replication to help you achieve business continuity with the shortest allowable downtime.
  • Refer to your overall BCP to determine your organisation’s critical functions, services, and products as well as their respective priority rankings to know what corresponding IT processes need to be in place first.
  • Implement IT Security to your system to reduce the risks associated with malware and hackers.
  • Introduce best practices to make future disaster recovery efforts as seamless as possible.

We can also assist you with the following:

2015 ESOS Guidelines Chapter 7, 8 & 9 – Sign-Off, Compliance & Appeals

This is the final chapter in our series of short posts summarising the quite complex ESOS guidelines (click on ?Comply with ESOS? to see the details). This one addresses the legalities to follow to complete your report – and how to appeal if you are not happy with any of the Environment Agency?s decisions.

  1. Director Sign-Off

This is by no means an easy ride. Confirmation of the work at individual or lead assessor level locks the company into the penalty cycle in the event there are significant irregularities. By signing off the assessment, the board level director(s) # agree that they have

  • Reviewed the enterprise?s ESOS recommendations
  • Believe the enterprise is within the scope of the scheme
  • Believe the enterprise is compliant with the scheme
  • Believe the information provided is correct

Having an internal assessor requires a second board-level signature.

  1. Compliance

You report compliance on the internet. This is free and you can do it at any time within the deadline. You can dip in and out of the process as many times as you wish, but must use the link in the receipting email. While this is something a board member must do, there is no reason why the lead assessor should not complete the basics. The online compliance notification addresses the following topics:

  • The ESOS contact person in the enterprise
  • Any aggregation / dis-aggregation during the period
  • The names and contact details of the lead assessor
  • The proportion of energy consumption per compliance route

The Environment Agency will acknowledge receipt. This does not constitute acceptance. You should keep the ESOS evidence pack in a safe place with at least one backup elsewhere.

  1. Compliance & Enforcement Issues

In the event the Environment Agency decides your enterprise has not met ESOS requirements, it may either (a) issue a compliance notice with instructions, or (b) apply one of the following civil penalties:

  • A fine of up to ?5,000 for failure to maintain records
  • A fine of up to ?50,000 for failure to undertake an energy audit
  • A fine of up to ?50,000 for a false or misleading statement

Any enterprise has the right of appeal against government decisions. In the case of ESOS, this is via:

  • The First-Tier Tribunal if your enterprise is England, Wales or off-shore based
  • The Scottish Minister if your enterprise is based in Scotland
  • The Planning Commission if your enterprise is Northern Ireland-based

The notice you appeal against will supply details of the appeal steps to take.

This blog and its companion chapters concerning the ESOS Guidelines as amended 2015 are with compliments of ecoVaro. We are the people who break ESOS data into manageable chunks of information, so that board-level directors have greater confidence in what they sign.

ESOS Facts on a Page

The UK?s ESOS energy saving program stands for ?Energy Savings Opportunity Scheme?. Its purpose is to reduce demand – and hence fossil-based pollution at both ends of the supply chain. It currently applies to large UK companies only. However its guidelines are also valuable input to smaller firms voluntarily going greener.

The program threshold is 250 employees and / or turnover or at least ?UK50 million. This affects approximately 9,000 UK firms, with others below the threshold wondering whether the government plans to lower it. In essence, ESOS requires that qualifying businesses complete comprehensive audits of energy use and opportunities at least every fourth year.

The plan is carrot and stick. Compliant companies will probably uncover significant savings when they stop and measure. They may even unearth carbon credits they can sometime exchange for cash. Reactionary firms who try to duck the issue will feel Her Majesty?s wrath through stiff penalties. In time, they may find it harder to attract investors. If ESOS affects your company, then the wise thing could be complying by the first deadline of 5 December 2015.

To do so, you must conduct an energy audit and report it to the UK Environment Agency. This comprises

  1. Measuring total energy use across processes, transport and facilities
  2. Pie charting 90% of this to identify areas that are energy intensive
  3. Singling out cost-effective energy-saving projects in high use areas
  4. Submitting your report to the Environment Agency ahead of the deadline

ecoVaro recommends affected companies do not leave this to the last minute. While having ISO 50001 may exempt some from ESOS, the regulations are far from straightforward and it will take months to reach complete clarification. We would like to suggest a more balanced approach.

ESOS is a wonderful incentive to save energy costs while contributing to a better future for the kids. The Energy Savings Opportunity Scheme is precisely that. The cost of energy has crept up on us to the extent that we have to do something, government or no government.

Measuring energy consumption is as simple as installing meters at critical points in the flow, and you probably have many of them anyway. Once you have your data you no longer have to crunch the numbers. ecoVaro can do this for you and return the result in the form of handy graphs and spreadsheets.

Ready to work with Denizon?