Align IT Investments With Organization Goals

While some organisation leaders loathe spending on IT, a growing number are already convinced of the necessity of investing in it. Unfortunately, a substantial fraction of those convinced to pursue IT investments are misguided as to which initiatives are really contributory to reaching their organisation’s goals.

In the end, many of their purchases either end up underutilised or become white elephants altogether. There are also those difficult to spot – IT purchases that do become integrated into daily operations but have little effect on the organisation’s growth, positioning, profitability, or efficiency.

If a purchase is to cost your company a fortune, then its positive impact on established company objectives should reflect accordingly. But how would you know it would? You can’t hope to foresee all its benefits especially if the IT solution is still quite new to you.

Our job is not only to identify the strengths of an IT system but also to determine whether these strengths are at all useful to your organisation’s thrusts.

Basically, here’s what we’ll do:

  • Conduct a rigorous analysis of your organisation to determine the specific and overall impact of certain IT solutions. We’ll be looking for areas where the effects of IT can result in the most rapid reduction of costs and, at the same time, drive the organisation in the direction of its established goals.
  • Propose cohesive best-of-breed solutions in line with the results of our analysis. Our familiarity with the IT landscape and our extensive selection of contacts in the industry will allow us to conduct insightful picks from a vast field of choices.
  • Establish best practices to make sure IT investments are optimally utilised.
  • Perform periodic reviews to ensure practices and processes are still in line with the established goals.

Find out how we can increase your efficiency even more:

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Check our similar posts

Total Quality Management

Total Quality Management (TQM) is another business management approach that focuses on the involvement of all members of the organisation to participate in improving processes, products, services, and the culture in which they work in. It is important that every team member realises how each individual and each activity affects, and in turn is affected by, others.

With the use of combined quality and management tools, TQM also aims to reduce losses brought about by wasteful practices, a common concern in most companies. Using the TQM strategy, business would also be able to identify the cause of a defect, thereby preventing it from entering the final product.

Deming’s 14 Points

At the core of the Total Quality Management concept and implementation is Deming’s 14 points, a set of guidelines on quality as conceptualised by W Edwards Deming, one of the pioneers of quality. Deming’s 14 points are as follows:

  1. Create constancy of purpose for improving products and services.
  2. Adopt the new philosophy.
  3. Cease dependence on inspection to achieve quality.
  4. End the practice of awarding business on price alone; instead, minimise total cost by working with a single supplier.
  5. Improve constantly and forever every process for planning, production and service.
  6. Institute training on the job.
  7. Adopt and institute leadership.
  8. Drive out fear.
  9. Break down barriers between staff areas.
  10. Eliminate slogans, exhortations and targets for the workforce.
  11. Eliminate numerical quotas for the workforce and numerical goals for management.
  12. Remove barriers that rob people of pride of workmanship, and eliminate the annual rating or merit system.
  13. Institute a vigorous program of education and self-improvement for everyone.
  14. Put everybody in the company to work accomplishing the transformation.

But if you were to reduce to bare bones the TQM philosophy from Deming’s 14 points, it would all come down to two simple goals:

  1. To make things right the first time; and
  2. To work for continuous improvement.

As with all other quality management process, the end goal is to be able to offer products and services that meet and even exceed customer’s expectations.

Find out more about our Quality Assurance services in the following pages:

How Sustainable is Suez Environment

French-based Suez Environment works in the water and waste-management environment, with specific reference to water production, treatment, & pollution disposal, and waste treatment, recycling, incineration and site desensitisation. Its more than 65,000 employees distributed worldwide have participated in flagship projects like Renault’s goal of 95% reclamation of vehicle parts, and Lyonnaise des Eaux?s saving of 12 million cubic meters of water in a single year.

Suez Environment claims to have consistently increased the recovery rate of treated waste, decreased direct and indirect greenhouse gas emissions, and made significant inroads into the production of sustainable energy on behalf of its clients. But then surely that’s Suez Environment’s business, and with over 65,000 employees we are entitled to expect this. Given that there have been persistent allegations of privatised water distribution bumping prices up to the detriment of the poor, how effective is Suez Environment at practising what it preaches back home?

GDF Suez is its largest shareholder and includes it under its environmental and societal responsibility umbrella. This makes environmental performance an overarching goal alongside management systems, health and safety, risk and procurement, and ethics. Its environmental ambitions spin out into the following strategies:

  • Understand the interactions between our activities and the environment
  • Open dialogue with stakeholders and foster partnerships with them
  • Set quantitative and qualitative targets at all levels of the organisation
  • Achieve optimum balance between financial and environmental challenges
  • Be proactive; anticipate impacts on the environment and plan for them
  • Increase employee awareness through interactive training and education
  • Be constantly innovative; share successes within the organisation
  • Monitor progress continuously and publish measured results achieved.

These goals direct the Suez Environment management team?s attention towards optimising performance in key areas like greenhouse gases, energy management, renewable energy, biodiversity, responsible water management, pollution prevention and health and safety considerations.

Among numerous other examples, its waste incineration programs convert hazardous and conventional waste into heat used to generate electricity without requiring virgin carbon products. Elsewhere, the same energy warms market-gardening tunnels and work places on winter days.

Suez Environment uses sophisticated energy management software to analyse information that’s transmitted by data logging devices online. ecoVaro provides a similar service in the cloud. ecoVaro adapts to your requirements providing fresh insights to your business.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
FUJIFILM Cracks the Energy Code

FUJIFILM was in trouble at its Dayton, Tennessee plant in 2008 where it produced a variety of speciality chemicals for industrial use. Compressed-air breakdowns were having knock-on effects. The company decided it was time to measure what was happening and solve the problem. It hoped to improve reliability, cut down maintenance, and eliminate relying on nitrogen for back-up (unless the materials were flammable).

The company tentatively identified three root causes. These were (a) insufficient system knowledge within maintenance, (b) weak spare part supply chain, and (c) generic imbalances including overstated demand and underutilised supply. The maintenance manager asked the U.S. Department of Energy to assist with a comprehensive audit of the compressed air system.

The team began on the demand side by attaching flow meters to each of several compressors for five days. They noticed that – while the equipment was set to deliver 120 psi actual delivery was 75% of this or less. They found that demand was cyclical depending on the production phase. Most importantly, they determined that only one compressor would be necessary once they eliminated the leaks in the system and upgraded short-term storage capacity.

The project team formulated a three-stage plan. Their first step would be to increase storage capacity to accommodate peak demand; the second would be to fix the leaks, and the third to source a larger compressor and associated gear from a sister plant the parent company was phasing out. Viewed overall, this provided four specific goals.

  • Improve reliability with greater redundancy
  • Bring down system maintenance costs
  • Cut down plant energy consumption
  • Eliminate nitrogen as a fall-back resource

They reconfigured the equipment in terms of lowest practical maintenance cost, and moved the redundant compressors to stations where they could easily couple as back-ups. Then they implemented an online leak detection and repair program. Finally, they set the replacement compressor to 98 psi, after they determined this delivered the optimum balance between productivity and operating cost.

Since 2008, FUJIFILM has saved 1.2 million kilowatt hours of energy while virtually eliminating compressor system breakdowns. The single compressor is operating at relatively low pressure with attendant benefits to other equipment. It is worth noting that the key to the door was measuring compressed air flow at various points in the system.

ecoVaro specialises in analysing data like this on any energy type.?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Ready to work with Denizon?