What Sub-Metering did for Nissan in Tennessee

When Nissan built its motor manufacturing plant in Smyrna 30 years ago, the 5.9 million square-foot factory employing over 8,000 people was state of art. After the 2005 hurricane season sky-rocketed energy prices, the energy team looked beyond efficient lighting at the more important aspect of utility usage in the plant itself. Let’s examine how they went about sub-metering and what it gained for them.

The Nissan energy team faced three challenges as they began their study. They had a rudimentary high-level data collection system (NEMAC) that was so primitive they had to transfer the data to spread-sheets to analyse it. To compound this, the engineering staff were focused on the priority of getting cars faster through the line. Finally, they faced the daunting task of making modifications to reticulation systems without affecting manufacturing throughput. But where to start?

The energy team chose the route of collaboration with assembly and maintenance people as they began the initial phase of tracking down existing meters and detecting gaps. They installed most additional equipment during normal service outages. Exceptions were treated as minor jobs to be done when convenient. Their next step was to connect the additional meters to their ageing NEMAC, and learn how to use it properly for the first time.

Although this was a cranky solution, it had the advantage of not calling for additional funding which would have caused delays. However operations personnel were concerned that energy-saving shutdowns between shifts and over weekends could cause false starts. ?We’ve already squeezed the lemon dry,? they seemed to say. ?What makes you think there?s more to come??

The energy team had a lucky break when they stumbled into an opportunity to prove their point early into implementation. They spotted a four-hourly power consumption spike they knew was worth examining. They traced this to an air dryer that was set to cyclical operation because it lacked a dew-point sensor. The company recovered the $1,500 this cost to fix, in an amazing 6 weeks.

Suitably encouraged and now supported by the operating and maintenance departments, the Smyrna energy team expanded their project to empower operating staff to adjust production schedules to optimise energy use, and maintenance staff to detect machines that were running without output value. The ongoing savings are significant and levels of shop floor staff motivation are higher.

Let’s leave the final word to the energy team facilitator who says, ?The only disadvantage of sub-metering is that now we can’t imagine doing without it.?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Check our similar posts

Maturing Into CMMI

 

In all likelihood, the reason why you landed on this page was because you were seeking CMMI experts to help you meet the demands of a growing number of potential clients who require CMMI compliance.

Whether or not you’re here for that reason, you might want to know why CMMI or Capability Maturity Model Integration is steadily becoming a common denominator among highly successful software and engineering development companies. If you stay for a while, we can show you how CMMI can substantially increase your organisation’s chances of:

  • reducing development costs;
  • acquiring new customers and retaining old ones;
  • beating deadlines;
  • bringing down development time;
  • increasing the overall quality of your products and services; and
  • improving the level of satisfaction of customers, employees, and all other stakeholders.

Surely, no organisation can be too small or too big to aspire for such benefits of attaining high levels of maturity and capability.

If you want to look beyond Maturity Level ratings, then you’ve come to the right place. We focus on introducing CMMI principles and blending them into your organisation’s culture to achieve a truly superior and sustainable business advantage. Compliance will then be an inevitable offshoot of the actions you make.

Likewise, if you simply want to obtain a deeper understanding of CMMI and learn how it can be applied either to your entire organisation or to specific projects, we’d be happy to assist you in that regard as well.

Finally, when you’re ready, we can also conduct CMMI appraisals either for benchmarking purposes or simply for determining how well your process improvement initiatives are going.

CMMI Consulting

Are you worried that implementing CMMI might entail an overhaul of your current processes? Don’t be.

CMMI is all about improving current processes, not replacing them. Ideally, the final result of all process improvement activities should be hinged on your own business objectives and context, so we’ll make sure it remains that way when we work with you.

We rely on our extensive knowledge and experience in CMMI, engineering, software development, and technologies as well as in change and project management in providing model-based process improvement services. Whether you’re gearing up for an appraisal or simply want to employ CMMI-based practices, these are the things we can do for you.

  • Help you interpret how CMMI can be implemented in relation to your business.
  • Assist in convincing sponsors and stakeholders to support your CMMI implementation initiatives.
  • Introduce the necessary training to all individuals who need to undertake them.
  • Conduct a Gap Analysis to find out where your company’s current processes stand relative to their CMMI specifications.
  • Assemble a process group that will champion your process improvement initiatives. We’ll facilitate effective collaboration among its team members, transforming them into a cohesive force designed to carry out plans and motivate everyone else down the line.
  • Introduce tools and practices that will improve the efficiency of our process improvement initiatives.
  • Carry out periodic evaluations and produce reports to provide sponsors and stakeholders a clear picture of our progress.

CMMI Training

Still not convinced CMMI is right for you? There’s only one way to fully grasp the benefits of implementing CMMI – take the Introduction to CMMI course. Although what happens next is entirely up to you, we’re pretty sure you’ll make the right decision after passing it.

Do you need to include people from your organisation in a SCAMPI (Standard CMMI Appraisal Method for Process Improvement) team? They’ll have to undergo this course too. The Introduction to CMMI is for systems and software engineering managers and practitioners, appraisal team members, process group members, and basically anyone who want to grasp CMMI fundamentals.

This is what you’ll be able to do after going through 3 days of lectures and exercises:

  • Gain a deeper understanding of the various components of CMMI-DEV models and their relationships.
  • Discuss the process areas in CMMI-DEV models.
  • Extract and interpret aspects in the model relevant to your own organisation’s processes.

We also offer highly specialised training and workshops such as those for:

  • Achieving High Maturity Levels
  • Top Executives
  • Team Building in Preparation for Appraisals

CMMI Appraisal

An organisation new to CMMI will want to know first how far their current processes are relative to the implementation of model-based improvements in order to determine the resources and time that have to be spent to get there.

Similarly, an organisation already well acquainted with CMMI and has begun taking steps in improving processes, will eventually want to know how close it has come to the Maturity Level it has aimed for.

In both cases, these organisations will have to be assessed by a qualified CMMI appraiser to obtain an accurate picture of their current status. We can perform appraisals on either your entire organisation or on specific projects/practices within a process area. Our appraisers can conduct the following SCAMPI (Standard CMMI Appraisal Method for Process Improvement) appraisals:

  • SCAMPI Class A – This is what you’ll need if you’re aiming for a level rating.
  • SCAMPI Class B – You may want to use this for process reviews or for preparing for a SCAMPI Class A.
  • SCAMPI Class C or Gap Analysis – We typically conduct this for organisations who have yet to implement CMMI-based initiatives so that they can design the most cost-effective road map for the implementation proper.
Disadvantages of Spreadsheets

Spreadsheets are flexible, inexpensive and easy to use. They are especially handy when it comes to beating report submission deadlines or making impromptu data computations. That’s why office workers, managers and even executives have made spreadsheets their go-to solution for such undertakings and more.

Spreadsheets have become so ubiquitous, that they’ve found their way into a wide range of applications including complex modelling, accounting reconciliations, market data analysis, work flow tracking and monitoring, analytical review and financial reporting.

Unfortunately, organisations heavy reliance on spreadsheets have made these User Developed Applications (UDA) into high-risk office tools. Simple spreadsheet errors like leaving out a negative sign or a cut-and-paste mistake have already caused million-dollar discrepancies. Also, when a fraudulent employee enters into the picture, the risks become unimaginable.

Think TransAlta?s spreadsheet cut-and-paste glitch (the company later called this a ?simple clerical error?) which caused the energy firm a whopping $24 million loss or Fidelity?s overstatement of its earnings owing to the omission of the minus sign on the spreadsheet of a $1.3 billion net capital loss.

In both cases and in many other similar spreadsheet fiasco, the errors played a major role in the organisation’s decision-making, leading to disastrous results including, but not limited to financial loss, shattered investor confidence and public embarrassment.

If these are scenarios your organisation can ill afford, then it’s time to ask yourself: Do the disadvantages of spreadsheets far outweigh their benefits to merit a call for total liberation from them?

More Spreadsheet Blogs


Spreadsheet Risks in Banks


Top 10 Disadvantages of Spreadsheets


Disadvantages of Spreadsheets – obstacles to compliance in the Healthcare Industry


How Internal Auditors can win the War against Spreadsheet Fraud


Spreadsheet Reporting – No Room in your company in an age of Business Intelligence


Still looking for a Way to Consolidate Excel Spreadsheets?


Disadvantages of Spreadsheets


Spreadsheet woes – ill equipped for an Agile Business Environment


Spreadsheet Fraud


Spreadsheet Woes – Limited features for easy adoption of a control framework


Spreadsheet woes – Burden in SOX Compliance and other Regulations


Spreadsheet Risk Issues


Server Application Solutions – Don’t let Spreadsheets hold your Business back


Why Spreadsheets can send the pillars of Solvency II crashing down

?

Advert-Book-UK

amazon.co.uk

?

Advert-Book-USA

amazon.com

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
How Westin Melbourne Hotel Trimmed its Footprint

Becoming sustainable is a three-pronged process. You must save money and push the buttons the government is pressing you to. But there?s a deeper, more urgent issue. If your customers mark you down for not being green enough you are heading for trouble. Let’s see how well this hotel is doing.

The Melbourne flagship of the Westin hotel chain boasts 262 spacious rooms with views of Melbourne Square and surrounding theatres, designer boutiques, galleries and national landmarks. The architects included conference facilities, a wellness centre and sundry bars and restaurants. After climate change arrived to stay, hotel management discovered they had inherited a water and energy-greedy monster. Their solution was to measure what was going through their systems, and then progressively cap the building?s greedy appetite.

The Melbourne Westin Hotel could not have achieved results without these metrics. They began by determining key indicators and measuring them. This provided them with criteria to set achievable, cost effective targets in the following key areas of their business:

  1. Water Management ? Demand-based linen and towel recycling, installation of back-washable water filters, water-saving shower heads, dual-flush toilets.
  2. Waste Management ? Conversion to green products, recycling kitchen oil, moving towards a paperless office, recycling everything possible.
  3. Energy Management ? Energy-efficient light bulbs, standby settings for lights, computers, televisions and air conditioners
  4. Stakeholder Communication ? Staff green-team training, guest education, ongoing employee briefings
  5. Strategic Positioning ? Visible, top-down commitment, optimised carbon offsets from clean, renewable energy sources, clearly stated position in the market

Westin?s Melbourne landmark has made good progress towards becoming the green hotel for others to follow. It has adjusted its environmental policies, increased water and energy awareness and implemented tight waste management.

Consumers are already shopping to make their carbon footsteps lighter. Food stores are on the bandwagon although apparel is lagging. Perhaps it’s time you found out just how your company is shaping up. It’s no longer a matter of ?if carbon taxes?. It’s a matter of ?when it does?.

ecoVaro is a software system-in-the-cloud that lets you enter your water and energy consumption and process it online so you can monitor and manage your usage. In no time at all you could be saving money like Westin Melbourne did. Does that sound like something worth investigating?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Ready to work with Denizon?