Article 8 of the EU Energy Efficiency Directive ? Orientation

Following in-depth discussion of the UK?s ESOS response, we decided to backtrack to the source, especially since every EU member is facing similar challenges. The core purpose of the directive is to place a pair of obligations on member states. These are

  1. To promote the availability of energy audits among final customers in all sectors, and;
  2. To ensure that enterprises that are not SMEs carry out energy audits at least every four years.

Given the ability for business to look twice at every piece of legislation it considers unproductive, the Brussels legislators took care to define what constitutes an enterprise larger than an SME.

Definition of a Large Undertaking

A large undertaking meets one or both of the following conditions:

  1. It employs 250 or more people
  2. Its annual turnover is more than ?50 million and its balance sheet total exceeds ?43 million

Rules for Energy Audits

If accredited / qualified in-house specialists are unavailable then independent experts should supervise audits. The talent shortage seems common to many EU businesses. In hindsight, the Union could have ramped up slower, especially since the first compliance date of 5 December 2015 does not leave much swing room.

ecoVaro doubts there was a viable alternative, given the urgent imperative to beat back the scourge of carbon that is threatening the viability of our planet. The legislators must have been of a similar mind when laying down the guidelines. Witness for example the requirement that penalties be ?effective, proportionate and dissuasive?.

In order to be compliant, an energy audit must

  1. Be based on twelve months of verifiable data that is
    • over a continuous period beginning no more than 24 months before the beginning of the energy audit, and;
    • identifies energy saving opportunities including paths to their achievement
  2. Analyse the participant’s energy consumption and energy efficiency
  3. Have not been used as the basis for an energy audit in a previous compliance period

Measurement of current status and progress tracing are at the core of energy saving and good governance generally. EcoVaro has a powerhouse of software tools available on the cloud to help project teams save time and money.

Check our similar posts

How Accenture Keeps Rolling Out Sustainability

Multinational management-consulting and technology-services company Accenture has a good eye for sniffing out new business, with 305,000 employees advancing its interests in more than 200 cities in 56 countries evidence. Last year, it netted US$30 billion profit that is a tidy sum of money in anybody?s books.

Accenture also practices what it preaches. This is maximum business efficiency within moral standards. It tracks its carbon emissions from its offices around the world. Being a technology services company it is unsurprising that it automated the process. Being management consultants it can drill down to finest detail in its search for continuous improvement.

As a forward-thinking company Accenture is committed to transplanting its business skills into other organizations, in order to drive higher performance and sustain greater profits in the long term. It works with clients across borders and industries to integrate sustainability into their business models, and find effective ways to lighten carbon footprints.

The City of Seattle in Washington is a case in point. Following a proud history of nature and energy conservation, it engaged Accenture in 2013 to help it reduce downtown power consumption by 25%. Other project members were Microsoft supplying software, the local power utility for technical advice, and a non-profit to set up a smart building program. The initiative uses cloud services to process the big data generated by a host of building management services, plus a multitude of sensors, controls and meters.

The project is vital for the City. It wants to continue expanding but needs to avoid another power plant polluting its skyline. At the time of writing, the pilot sites had proved successful and the program was rolling out. Seattle?s next challenge is to acquire 15% of its energy from renewable sources by 2020.

The smart building solutions Seattle trialled in five downtown buildings, had a further welcome spinoff; by reducing operating times, facility managers can look forward to extended equipment life and fewer maintenance downtimes. The green building philosophy is alive and well in the City of Seattle, driven both by necessity and vision.

It is a no longer as question of if – but when – other urban communities follow suit. EcoVaro believes it is time long due for individual companies to start enjoying lower energy costs plus the prospect of profitably trading carbon credits. The process begins with measuring what you have and identifying cost-effective savings.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
User-Friendly RASCI Accountability Matrices

Right now, you’re probably thinking that’s a statement of opposites. Something dreamed up by a consultant to impress, or just to fill a blog page. But wait. What if I taught you to create order in procedural chaos in five minutes flat? ?Would you be interested then?

The first step is to create a story line ?

Let’s imagine five friends decide to row a boat across a river to an island. Mary is in charge and responsible for steering in the right direction. John on the other hand is going to do the rowing, while Sue who once watched a rowing competition will be on hand to give advice. James will sit up front so he can tell Mary when they have arrived. Finally Kevin is going to have a snooze but wants James to wake him up just before they reach the island.

That’s kind of hard to follow, isn’t it ?

Let’s see if we can make some sense of it with a basic RASCI diagram ?

Responsibility Matrix: Rowing to the Island
Activity Responsible Accountable Supportive Consulted Informed
Person John Mary Sue James Kevin
Role Oarsman Captain Consultant Navigator Sleeper

?

Now let’s add a simple timeline ?

Responsibility Matrix: Rowing to the Island
? Sue John Mary James Kevin
Gives Direction ? ? A ? ?
Rows the Boat ? R ? ? ?
Provides Advice S ? ? ? ?
Announces Arrival ? ? A C ?
Surfaces From Sleep ? ? ? C I
Ties Boat to Tree ? ? A ? ?

?

Things are more complicated in reality ?

Quite correct. Although if I had jumped in at the detail end I might have lost you. Here?s a more serious example.

rasci

?

There?s absolutely no necessity for you so examine the diagram in any detail, other to note the method is even more valuable in large, corporate environments. This one is actually a RACI diagram because there are no supportive roles (which is the way the system was originally configured).

Other varieties you may come across include PACSI (perform, accountable, control, suggest, inform), and RACI-VS that adds verifier and signatory to the original mix. There are several more you can look at Wikipedia if you like.

FUJIFILM Cracks the Energy Code

FUJIFILM was in trouble at its Dayton, Tennessee plant in 2008 where it produced a variety of speciality chemicals for industrial use. Compressed-air breakdowns were having knock-on effects. The company decided it was time to measure what was happening and solve the problem. It hoped to improve reliability, cut down maintenance, and eliminate relying on nitrogen for back-up (unless the materials were flammable).

The company tentatively identified three root causes. These were (a) insufficient system knowledge within maintenance, (b) weak spare part supply chain, and (c) generic imbalances including overstated demand and underutilised supply. The maintenance manager asked the U.S. Department of Energy to assist with a comprehensive audit of the compressed air system.

The team began on the demand side by attaching flow meters to each of several compressors for five days. They noticed that – while the equipment was set to deliver 120 psi actual delivery was 75% of this or less. They found that demand was cyclical depending on the production phase. Most importantly, they determined that only one compressor would be necessary once they eliminated the leaks in the system and upgraded short-term storage capacity.

The project team formulated a three-stage plan. Their first step would be to increase storage capacity to accommodate peak demand; the second would be to fix the leaks, and the third to source a larger compressor and associated gear from a sister plant the parent company was phasing out. Viewed overall, this provided four specific goals.

  • Improve reliability with greater redundancy
  • Bring down system maintenance costs
  • Cut down plant energy consumption
  • Eliminate nitrogen as a fall-back resource

They reconfigured the equipment in terms of lowest practical maintenance cost, and moved the redundant compressors to stations where they could easily couple as back-ups. Then they implemented an online leak detection and repair program. Finally, they set the replacement compressor to 98 psi, after they determined this delivered the optimum balance between productivity and operating cost.

Since 2008, FUJIFILM has saved 1.2 million kilowatt hours of energy while virtually eliminating compressor system breakdowns. The single compressor is operating at relatively low pressure with attendant benefits to other equipment. It is worth noting that the key to the door was measuring compressed air flow at various points in the system.

ecoVaro specialises in analysing data like this on any energy type.?