A Small External Enterprise Development Team is Cheaper than Your Own

Time is money in the application development business. We have to get to market sooner so someone else does not gazump us, and pip us at the post. We increase the likelihood of this with every delay. Moreover, the longer your in-house team takes to get you through the swamp, the higher the project cost to you.

Of course, in theory this should not be the case. Why bring in a team from outside, and pay more to support their corporate structure? Even going for a contract micro team ought not to make financial sense, because we have to fund their mark-up and their profit taking. Our common sense tells us that this is crazy. But, hold that thought for a minute. What would you say if a small external enterprise development team was actually cheaper? To achieve that, they would have to work faster too.

The costs of an Enterprise Internal Development Team

Even if you were able to keep your own team fully occupied ? which is unlikely in the long term ? having your own digital talent pool works out expensive when you factor in the total cost. Your difficulties begin with the hiring process, especially if you do not fully understand the project topic, and have to subcontract the hiring task.

If you decide to attempt this yourself, your learning curve could push out the project completion date. Whichever way you decide to go, you are up for paying advertising, orientation training, technical upskilling, travel expenses, and salaries all of which are going to rob your time. Moreover, a wrong recruitment decision would cost three times the new employee?s annual salary, and there is no sign of that changing.

But that is not all, not all by far. If want your in-house team to keep their work files in the office, then you are going to have to buy them laptops, plus extra screens so they can keep track of what they are doing. Those laptops are going to need desks, and those employees, chairs to sit in. Plus, you are going to need expensive workspace with good security for your team?s base.

If we really wanted to lay it on, we would add software / cloud costs, telephony, internet access, and ongoing technical training to the growing pile. We did a quick scan on PayScale. The median salary of a computer programmer in Ireland is ?38,000 per year and that is just the beginning. If you need a program manager for your computer software, their salary will be almost double that at ?65,000 annually.

Advantages of R&D outsourcing

The case for a small externally sourced enterprise development team revolves around the opportunity cost ? or loss to put in bluntly ? of hiring your own specialist staff for projects. If you own a smaller business with up to 100 people, you are going to have to find work for idle digital fingers, after you roll out your in-house enterprise project. If you do not, you head down the road towards owning a dysfunctional team lacking a core, shared objective to drive them forward.

Compared to this potential extravagance, hiring a small external enterprise development team on an as-needed basis makes far more sense. Using a good service provider as a ?convenience store? drives enterprise development costs down through the floor, relative to having your own permanent team. Moreover, the major savings that arise are in your hands and free to deploy as opportunities arise. A successful business is quick and nimble, with cash flow on tap for R & D.

Check our similar posts

FUJIFILM Cracks the Energy Code

FUJIFILM was in trouble at its Dayton, Tennessee plant in 2008 where it produced a variety of speciality chemicals for industrial use. Compressed-air breakdowns were having knock-on effects. The company decided it was time to measure what was happening and solve the problem. It hoped to improve reliability, cut down maintenance, and eliminate relying on nitrogen for back-up (unless the materials were flammable).

The company tentatively identified three root causes. These were (a) insufficient system knowledge within maintenance, (b) weak spare part supply chain, and (c) generic imbalances including overstated demand and underutilised supply. The maintenance manager asked the U.S. Department of Energy to assist with a comprehensive audit of the compressed air system.

The team began on the demand side by attaching flow meters to each of several compressors for five days. They noticed that – while the equipment was set to deliver 120 psi actual delivery was 75% of this or less. They found that demand was cyclical depending on the production phase. Most importantly, they determined that only one compressor would be necessary once they eliminated the leaks in the system and upgraded short-term storage capacity.

The project team formulated a three-stage plan. Their first step would be to increase storage capacity to accommodate peak demand; the second would be to fix the leaks, and the third to source a larger compressor and associated gear from a sister plant the parent company was phasing out. Viewed overall, this provided four specific goals.

  • Improve reliability with greater redundancy
  • Bring down system maintenance costs
  • Cut down plant energy consumption
  • Eliminate nitrogen as a fall-back resource

They reconfigured the equipment in terms of lowest practical maintenance cost, and moved the redundant compressors to stations where they could easily couple as back-ups. Then they implemented an online leak detection and repair program. Finally, they set the replacement compressor to 98 psi, after they determined this delivered the optimum balance between productivity and operating cost.

Since 2008, FUJIFILM has saved 1.2 million kilowatt hours of energy while virtually eliminating compressor system breakdowns. The single compressor is operating at relatively low pressure with attendant benefits to other equipment. It is worth noting that the key to the door was measuring compressed air flow at various points in the system.

ecoVaro specialises in analysing data like this on any energy type.?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
Keys to Successful Matrix Management

Matrix management, in itself, is a breakthrough concept. In fact, there are a lot of organizations today that became successful when they implemented this management technique. However, there are also organizations that started it but failed. And eventually abandoned it in the end.

Looking at these scenarios, we can say that when you implement matrix management in your organisation, two things can happen – you either succeed or fail. And there?s nothing in between. The truth is, the effectiveness of matrix management lies in your hands and in your implementation. To ensure that you achieve your desired results, recognise these essential keys to successful matrix management.

Establish Performance Goals and Metrics

This should be done as soon as the team is formed, at the beginning of the year or during the process of setting organisational objectives. Whenever it is, the most important thing is that each team player understands the objectives and metrics to which their performances will be evaluated. This ensures that everyone is looking at the same set of objectives as they carry out their individual tasks.

Define Roles and Responsibilities

One pitfall of matrix management is its internal complexity. Awareness of this limitation teaches you to clearly define the roles and responsibilities of the team players up front. Basically, there are three principal sets of roles that should be explained vividly ? the matrix leader, matrix managers and the matrixed employees. It is important to discuss all the possible details on these roles, as well as their specific responsibilities, to keep track of each other?s participation in the projects of the organisation.

One effective tool to facilitate this discussion is through the RACI chart – Who is Responsible? Who is Accountable? Who should be Consulted? Who will Implement? With this, clarification of roles and responsibilities would be more efficient.

When roles are already clearly defined, each participant should review their job descriptions and key performance metrics. This is to make sure that the roles and responsibilities expected of you integrates consistently with your job in the organisation, as a whole.

Manage Deadlines

In matrix management, the employees report to several managers. They will likely have multiple deadlines to attend to and accomplish. There might even be conflicts from one deadline to another. Hence, each should learn how to schedule and prioritise their tasks. Time management and action programs should be incorporated to keep the grace under pressure.

Deliver Clear Communication

Another pitfall of matrix management is heightened conflict. To avoid unrealistic expectations, the matrix leaders and managers should communicate decisions and information clearly to their subordinates, vice versa. It would help if everyone will find time to meet regularly or send timely reports on progress.

Empower Diversity

Knowledge, working styles, opinions, skills and talents are diverse in a matrix organisation. Knowing this fact, each should understand, appreciate and empower the learning opportunities that this diversity presents. Trust is important. Respect to each other?s opinions is vital. And acknowledgement of differing viewpoints is crucial.

The impetus of matrix management is the same ? mobilise the organisation’s resources and skills to cope with the fast-paced changes in the environment. So, maximise the benefits of matrix management as you consider these essential keys to its successful implementation.

Can you do away with the Project Initiation Meeting?

Project initiation meetings are often skipped to fast-track projects. Once a sponsor is found, organisations go straight to project planning and execution. But based on our own experience, holding a project initiation meeting can actually eliminate many issues that may crop up in the future and hence may speed things up instead in the long run.

It is in the project initiation meeting where your project objectives and scope are clarified and all stakeholders are brought to the same page. Project sponsors and stakeholders will have to know in a nutshell what is needed from them, what the possible risks are, what different resources are required, and so on. So that, when it’s time to proceed to the next phase, everyone is already in-sync.

So what are taken up in such a meeting? Perhaps an actual example can help. Sometime in the past, we set out to work on an eCommerce website project. After conducting the project initiation meeting, these were some of the things we were able to accomplish:

  • Identified deliverables e.g. site design, interface to payment system, etc.
  • Come up with the project phases
  • Agreed what should be in and out of scope
  • Defined the acceptance test criteria
  • Identified possible risks
  • Identified the possible training and documentation work needed
  • Established whether any analysis was required, e.g. as with regards to payment interfaces
  • Formulated disaster recovery plans
  • Defined roles and responsibilities
  • Drafted timelines and due dates

Aren’t these covered in project planning? If the project is a big one, the answer is no. In a large project, project planning is a much more exhaustive activity. In a project initiation meeting, only the basic framework is defined.

Some questions may still remain unanswered after a project initiation meeting, but at least you already know what answers you need to look for. In the example we gave earlier, we left the meeting knowing that we needed:

  • a list of all necessary hardware to estimate the costs
  • to identify possible dependencies we might have with third parties
  • to identify what software had to be bought and what skills we needed to hire

When it was time to proceed to project planning, everyone involved already knew what direction we were taking. In effect, by not skipping the project initiation meeting, we were able to avoid many potential obstacles.