EU Energy Efficiency Directive & UK?s ESOS

In 2012 the European Union passed its EU Energy Efficiency Directive (EED) into law. This aims to reduce overall energy consumption by 20% by 2020. It placed an obligation on member states to pass back-to-back local legislation by June 2014.

EED Guidelines

The EED provides specific guidelines it expects member nations to address. The list is long and here are a few excerpts from it:

  • Large companies must use energy audits to identify ways to cut their energy consumption
  • Small and medium companies must be incentivised to voluntarily take similar steps
  • Public sector bodies must purchase energy-efficient buildings, products and services
  • Private energy-consumers must be empowered with information to help manage demand
  • Energy distributors / resellers must cut their own consumption by 1.5% annually
  • Legislators are free to substitute green building technology e.g. through better insulation
  • Every year, European governments must audit 3% of the buildings they own

Definition of Energy Audit

An energy-consumption audit is a question of measuring demand throughout a supply grid, with particular attention to individual modules and high demand equipment. While this could be an exercise repeated every four years to satisfy ESOS, it makes more sense to incorporate it into the monthly energy billing cycle.

Because energy use is not consistent but varies according to production cycle, this can produce reams of printouts designed to frustrate busy managers. ecoVaro offers an inexpensive, cloud-based analytic service that effortlessly accepts client data and returns it in the form of high-level graphic summaries.

Potential ESOS Beneficiaries

As many as 9,000 UK companies are obligated to do energy audits because they employ more than 250 employees, have a balance sheet total over ?36.5m or an annual turnover in excess of ?42m. Any smaller enterprise that finds energy a significant input cost, should also consider enlisting Ecovaro to help it to:

  • Obtain a better understanding of the energy side of their business
  • Achieve energy savings and share in a estimated ?3bn bonanza to 2030
  • Reduce carbon emissions to help meet their CRC commitments

More About ecoVaro

We offer web-based energy management software that helps you measure and manage energy costs. This strips data from your meters and generates personalised reports on a dashboard you control. This information helps you accurately zoom in on worthwhile opportunities. With Ecovaro on your side, ESOS truly becomes an Energy Saving OPPORTUNITY Scheme.

Check our similar posts

IT Transformation Defined

Businesses depend on IT to effectively manage business processes and to provide products and services to clients. As IT technologies advance, it is crucial that businesses update their hardware to remain competitive. But businesses should do more than simply upgrade their servers and should really strive to effect IT transformation.

What is IT Transformation?

IT transformation is the ongoing process of changing the way that a company uses IT to better align it with current business goals. Through the IT transformation process, businesses try to determine whether they are meeting mission-critical benchmarks through the incorporation of new IT technologies for corporate transformation.

For example, if one of the current business concerns is whether the company can improve customer service, the IT system will need to evolve in such a way that improves customer service in a measurable way.

Successfully Aligning the Technology to Business Goals

In order to successfully align the IT system with business goals, it is important to understand the newly integrated technologies to understand how they can change business processes. If a new feature is intended to make the server more secure, the management should know exactly how the feature will improve the security of the server and whether the new implementation is redundant.

Once the business objectives have been identified, IT transformation is carried out by changing both the software and hardware used by the company. An example would be the growing trend of server migration to the cloud. Cloud computing is the growing trend of making files and data accessible from anywhere. If an organisation believes that it can improve productivity through a server cloud migration, it will need a way to test this.

The IT Transformation Process

Given that IT transformation is directly related to the core business, the IT transformation process must begin by identifying which aspects of the company must be changed. Then, the company must determine?IT services that could potentially be integrated into the business in a way that will help the company achieve benchmarks. After the key decision-makers understand the IT network well enough to effectively implement it, the company must efficiently manage the transformation process. Then, after the IT has been integrated, the company must have a system in place to measure business transformation in a numerical way.

For example, when assessing customer satisfaction, one effective strategy would be to distribute customer satisfaction surveys that ask customers to rate their experiences on a scale of one to ten. The company can then measure the results of the customer satisfaction survey to determine whether the new IT implementations are accomplishing their intended goals.

If the expected benchmarks are not being met, the next step in the IT transformation process is to determine if there is a specific reason for that. Is there a way that the feature can be better integrated to achieve desired business objectives? Are there other features that can help the company better achieve its goals?

Upgrading a network can be an expensive process and it is important to identify early on which options are the most likely to benefit the company’s bottom line.

UK Government Updates ESOS Guidelines

Britain?s Environment Agency has produced an update to the ESOS guidelines previously published by the Department of Energy and Climate Change. Fortunately for businesses much of it has remained the same. Hence it is only necessary to highlight the changes here.

  1. Participants in joint ventures without a clear majority must assess themselves individually against criteria for participation, and run their own ESOS programs if they comply.
  2. If a party supplying energy to assets held in trust qualifies for ESOS then these assets must be included in its program.
  3. Total energy consumption applies only to assets held on both the 31 December 2014 and 5 December 2015 peg points. This is relevant to the construction industry where sites may exchange hands between the two dates. The definition of ?held? includes borrowed, leased, rented and used.
  4. Energy consumption while travelling by plane or ship is only relevant if either (or both) start and end-points are in the UK. Foreign travel may be voluntarily included at company discretion. The guidelines are silent regarding double counting when travelling to fellow EU states.
  5. The choice of sites to sample is at the discretion of the company and lead assessor. The findings of these audits must be applied across the board, and ?robust explanations? provided in the evidence pack for selection of specific sites. This is a departure from traditional emphasis on random.

The Environment Agency has provided the following checklist of what to keep in the evidence pack

  1. Contact details of participating and responsible undertakings
  2. Details of directors or equivalents who reviewed the assessment
  3. Written confirmation of this by these persons
  4. Contact details of lead assessor and the register they appear on
  5. Written confirmation by the assessor they signed the ESOS off
  6. Calculation of total energy consumption
  7. List of identified areas of significant consumption
  8. Details of audits and methodologies used
  9. Details of energy saving opportunities identified
  10. Details of methods used to address these opportunities / certificates
  11. Contracts covering aggregation or release of group members
  12. If less than twelve months of data used why this was so
  13. Justification for using this lesser time frame
  14. Reasons for including unverifiable data in assessments
  15. Methodology used for arriving at estimates applied
  16. If applicable, why the lead assessor overlooked a consumption profile

Check out: Ecovaro ? energy data analytics specialist 

Scrumming Down to Complete Projects

Everybody knows about rugby union scrums. For our purposes, perhaps it is best to view them as mini projects where the goal is to get the ball back to the fly-half no matter what the opposition does. Some scrums are set pieces where players follow planned manoeuvres. Loose / rolling scrums develop on the fly where the team responds as best according to the situation. If that sounds to you like software project management then read on, because there are more similarities?.

Isn’t Scrum Project Management the Same as Agile?

No it’s not, because Scrum is disinterested in customer liaison or project planning, although the team members may be happy to receive the accolades following success. In the same way that rugby players let somebody else decide the rules and arrange the fixtures, a software Scrum team just wants the action.

Scrum does however align closely ? dare I say interchangeably with Agile?s sprints. Stripping it of all the other stages frees the observer up to analyse it more closely in the context of a rough and tumble project, where every morning can begin with a backlog of revised requirements to back fit.

The 3 Main Phases of a Scrum

A Scrum is a single day in the life of a project, building onto what went before and setting the stage for what will happen the following day. The desired output is a block of component software that can be tested separately and inserted later. Scrumming is also a useful technique for managing any project that can be broken into discreet phases. The construction industry is a good example.

Phase 1 – Define the Backlog. A Scrum Team?s day begins with a 15 minute planning meeting where team members agree individual to-do lists called ?backlogs?.

Phase 2 – Sprint Towards the Goal. The team separates to allow each member to complete their individual lines of code. Little or no discussion is needed as this stage.

Phase 3 – Review Meeting. At the end of each working day, the team reconvenes to walk down what has been achieved, and check the interconnected functionality.

The 3 Main Phases of a Scrum ? Conclusions and Thoughts

Scrum is a great way to liberate a competent project team from unnecessary constraints that liberate creativity. The question you need to ask yourself as manager is, are you comfortable enough to watch proceedings from the side lines without rushing onto the field to grab the ball.