When the economy makes a downturn, companies, then eventually, employees suffer. Now, I’m sure you’re wary of frustrated laid-off employees stealing valuable data. Who knows? That information might end up in the hands of your competitors. Then as if that threat weren’t enough, there may be jobless IT specialists who turn to rogue activities either to earn a quick buck or simply out of lack of anything productive to do.

That’s not all, as we’ve got more news for you. When we think of IT Security, what instantly comes to mind are hackers and acts laced with mal-intent. However, a recent worldwide survey on IT security showed organisations were more inclined to expect data leakage as a result of accidental exposure by employees (45%) than of anything maliciously performed by an external entity (15%).

If you’re not aware of this, you’ll be focusing your spending on protection against incoming attacks while exposing your innards through accidental leakages. Our solution? While we’ll naturally provide your data with protection from outside threats, we’ll also put special attention in protecting it from the inside.

The defences we’ll put up include:

  • Data Loss Prevention
  • Network Security
  • Firewalls
  • Malware
  • Authentication and Access Control
  • Mobile Security
  • Forensics

Check our similar posts

What Energy Management Software did for CDC

Chrome Deposit Corporation ? that’s CDC for short ? reconditions giant rollers used to finish steel and aluminium sheets in Portage, Indiana by applying grinding, texturing and plating methods. While management was initially surprised when the University of Delaware singled their plant out for energy assessment, this took them on a journey to bring energy consumption down despite being in an expansion phase.

Metal finishing and refinishing is an energy-intensive business where machines mainly do the work while workforces as small as 50 individuals tend them. Environmental impacts also need countering within a challenging environment of burgeoning natural gas and electricity prices.

The Consultant’s Recommendations

The University of Delaware was fortunate that Chrome Deposit Corporation had consistently measured its energy consumption since inception in 1986. This enabled it to pinpoint six strategies as having potential for technological and process improvements.

  • Insulate condensate tanks and pipes
  • Analyse flue gas air-fuel ratios
  • Lower compressed air pressures
  • Install stack dampers on boilers
  • Replace belts with pulleys and cogs
  • Fit covers on plant exhaust fans

CDC implemented only four of the six recommendations. This was because the boiler manufacturer did not recommend stack dampers, and the company was unable to afford certain process automation and controls.

Natural Gas Savings

The project team began by analysing stack gases from boilers used to heat chrome tanks and evaporate wastewater. They found the boilers were burning rich and that several joints in gas lines were leaking. Correcting these issues achieved an instant gas saving of 12% despite increased production.

Reduced Water Consumption

The team established that city water was used to cool the rectifiers. It reduced this by an astonishing 85% by implementing a closed-loop system and adding two chillers. This also helped the water company spend less on chemicals, and energy to drive pumps, purifiers and fans.

Summary of Benefits

Electricity consumption reduced by 18% in real terms, and natural gas by 35%. When these two savings are merged they represent an overall 25% energy saving. These benefits were implemented across the company?s six other plants, resulting in benefits CDC management never dreamed of when the University of Delaware approached them.

ecoVaro offers a similar data analytics service that is available online worldwide. We have helped other companies slash their energy bills with similarly exciting results. We?ll be delighted to share ideas that only data analytics can reveal.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
Article 8 of the EU Energy Efficiency Directive ? Orientation

Following in-depth discussion of the UK?s ESOS response, we decided to backtrack to the source, especially since every EU member is facing similar challenges. The core purpose of the directive is to place a pair of obligations on member states. These are

  1. To promote the availability of energy audits among final customers in all sectors, and;
  2. To ensure that enterprises that are not SMEs carry out energy audits at least every four years.

Given the ability for business to look twice at every piece of legislation it considers unproductive, the Brussels legislators took care to define what constitutes an enterprise larger than an SME.

Definition of a Large Undertaking

A large undertaking meets one or both of the following conditions:

  1. It employs 250 or more people
  2. Its annual turnover is more than ?50 million and its balance sheet total exceeds ?43 million

Rules for Energy Audits

If accredited / qualified in-house specialists are unavailable then independent experts should supervise audits. The talent shortage seems common to many EU businesses. In hindsight, the Union could have ramped up slower, especially since the first compliance date of 5 December 2015 does not leave much swing room.

ecoVaro doubts there was a viable alternative, given the urgent imperative to beat back the scourge of carbon that is threatening the viability of our planet. The legislators must have been of a similar mind when laying down the guidelines. Witness for example the requirement that penalties be ?effective, proportionate and dissuasive?.

In order to be compliant, an energy audit must

  1. Be based on twelve months of verifiable data that is
    • over a continuous period beginning no more than 24 months before the beginning of the energy audit, and;
    • identifies energy saving opportunities including paths to their achievement
  2. Analyse the participant’s energy consumption and energy efficiency
  3. Have not been used as the basis for an energy audit in a previous compliance period

Measurement of current status and progress tracing are at the core of energy saving and good governance generally. EcoVaro has a powerhouse of software tools available on the cloud to help project teams save time and money.

Can you do away with the Project Initiation Meeting?

Project initiation meetings are often skipped to fast-track projects. Once a sponsor is found, organisations go straight to project planning and execution. But based on our own experience, holding a project initiation meeting can actually eliminate many issues that may crop up in the future and hence may speed things up instead in the long run.

It is in the project initiation meeting where your project objectives and scope are clarified and all stakeholders are brought to the same page. Project sponsors and stakeholders will have to know in a nutshell what is needed from them, what the possible risks are, what different resources are required, and so on. So that, when it’s time to proceed to the next phase, everyone is already in-sync.

So what are taken up in such a meeting? Perhaps an actual example can help. Sometime in the past, we set out to work on an eCommerce website project. After conducting the project initiation meeting, these were some of the things we were able to accomplish:

  • Identified deliverables e.g. site design, interface to payment system, etc.
  • Come up with the project phases
  • Agreed what should be in and out of scope
  • Defined the acceptance test criteria
  • Identified possible risks
  • Identified the possible training and documentation work needed
  • Established whether any analysis was required, e.g. as with regards to payment interfaces
  • Formulated disaster recovery plans
  • Defined roles and responsibilities
  • Drafted timelines and due dates

Aren’t these covered in project planning? If the project is a big one, the answer is no. In a large project, project planning is a much more exhaustive activity. In a project initiation meeting, only the basic framework is defined.

Some questions may still remain unanswered after a project initiation meeting, but at least you already know what answers you need to look for. In the example we gave earlier, we left the meeting knowing that we needed:

  • a list of all necessary hardware to estimate the costs
  • to identify possible dependencies we might have with third parties
  • to identify what software had to be bought and what skills we needed to hire

When it was time to proceed to project planning, everyone involved already knew what direction we were taking. In effect, by not skipping the project initiation meeting, we were able to avoid many potential obstacles.