Why DevOps Matters: Things You Need to Know

DevOps creates an agile relationship between system development and operating departments, so the two collaborate in providing results that are technically effective, and work well for customers and users. This is an improvement over the traditional model where development delivers a complete design ? and then spends weeks and even months afterwards, fixing client side problems that should never have occurred.
Writing for Tech Radar Nigel Wilson explains why it is important to roll out innovation quickly to leverage advantage. This implies the need for a flexible organisation capable of thinking on its feet and forming matrix-based project teams to ensure that development is reliable and cost effective.
Skirmishes in Boardrooms
This cooperative approach runs counter to traditional silo thinking, where Operations does not understand Development, while Development treats the former as problem children. This is a natural outcome of team-centred psychology. It is also the reason why different functions pull up drawbridges at the entrance to their silos. This situation needs managing before it corrodes organization effectiveness. DevOps aims to cut through this spider web of conflict and produce faster results.

The Seeds of Collaboration

Social and personal relationships work best when the strengths of each party compensate the deficiencies of the other. In the case of development and operations, development lacks full understanding of the daily practicalities operating staff face. Conversely, operations lacks ? and should lack knowledge of the nuances of digital automation, for the very reason it is not their business.
DevOps straddles the gap between these silos by building bridges towards a co-operative way of thinking, in which matrix-teams work together to define a problem, translate it into needs and spec the system to resolve these. It is more a culture than a method. Behavioural change naturally leads to contiguous delivery and ongoing deployment. Needless to say only the very best need apply for the roles of client representative, functional tester and developer lead.

Is DevOps Worth the Pain of Change?

Breaking down silos encroaches on individual managers? turf. We should only automate to improve quality and save money. These savings often distil into organisational change. The matrix team may find itself in the middle of a catfight. Despite the pain associated with change resistance, DevOps more than pays its way in terms of benefits gained. We close by considering what these advantages are.

An Agile Matrix Structure ? Technical innovation is happening at a blistering rate. The IT industry can no longer afford to churn out inferior designs that take longer to fix than to create. We cannot afford to allow office politics to stand in the way of progress. Silos and team builds are custodians of routine and that does not sit well with development.

An Integrated Organization ? DevOps not only delivers operational systems faster through contiguous testing. It also creates an environment whereby cross-border teams work together towards achieving a shared objective. When development understands the challenges that operations faces ? and operations understands the technical limiters – a new perspective emerges of ?we are in this together?.

The Final Word ? With understanding of human dynamics pocketed, a DevOps project may be easier to commission than you first think. The traditional way of doing development – and the waterfall delivery at the end is akin to a two-phase production line, in which liaison is the weakest link and loss of quality inevitable.

DevOps avoids this risk by having parties work side-by-side. We need them both to produce the desired results. This is least until robotics takes over and there is no longer a human element in play.

Check our similar posts

Is Your Project Agile, a Scrum or a Kanban?

Few projects pan out the way we expect when starting out. This is normal in any creative planning phase. We half suspect the ones that follow a straight line are the exceptions to the rule. Urban legend has it; Edison made a thousand prototypes before his first bulb lit up, and then went on to comment, ?genius is 1% inspiration, 99% perspiration?. Later, he added that many of life’s failures are people who did not realise just how close they were to success when they gave up.

So be it to this day, and so be it with project planning too. There is no one size fits all approach when it comes to it. Agile, Scrum and Kanban each have their supporters and places where they do well. Project planning often works best when we use a sequential combination of them, appropriate to what is currently happening on the ground.

Of the three, Agile is by far the most comprehensive. It provides a structure that begins with project vision / conceptualisation, and goes as far as celebration when the job is over, and retrospective discussion afterwards. However, the emphasis on daily planning meetings may dent freethinking, and even smother it.

Scrum on the other hand says ?forget all that bureaucracy?. There is a job to do and today is the day we are going to do it. Although the core Agile teamwork is still there it ignores macro project planning, and could not be bothered with staying in touch with customers. If using Scrum, it is best to give those jobs to someone else.

The joker in the pack is Kanban, It believes that rules are there to substitute for thought, and that true progress only comes from responsible freedom. It belongs in mature organisations that have passed through Scrum and Agile phases and have embarked on a voyage towards perfection.

That said, there can be no substitute for human leadership, especially when defined as the social influence that binds the efforts of others towards a single task.

Field Service Organisations should use Digital Forms

For many Organisations, making use of paper based forms, is a common practice and method for collecting data and recording transactions. Whether it be for producing Quotations, Invoices or even getting sign off on completed jobs.

Paper based forms and documents have been the main stay of office communication and productivity for over 200 years. Paper-based forms are used to create anything from Invoices, Receipts, Purchase Orders, Contracts to the humble internal memo!

Paper-based forms radically improved productivity, efficiency and compliance by enabling people to create paper based instructions and enabling others to add additional information as required.

Over the past 3 decades or so, modern business environments have gradually been evolving towards the concept of the Paperless Office, resulting in the humble Paper based document migrating to a Digital Counterpart. The ease of availability of various Word Processing and Spreadsheet software products and cheap and easy data storage capacity have resulted in the Proliferation of thousands if not millions of files and documents being stored somewhere on the Company’s IT infrastructure.

People often create Digital Templates of forms that may be printed off and supplied to staff to complete using Pen and Paper or electronically. The data collation and reporting is often process

Often when conducting Operational Reviews, it is commonly found that the processing and analysing paper based forms is the least productive, efficient and profitable areas of business, although it is often vitally important.

Benefits of using digital forms for data collection

The ability to collect and analyse data effectively is increasingly important to businesses. Companies gather, examine, process and build reports on large volumes of data. Traditionally, they have deployed mail surveys, telephone interviews, door-to-door interviews as methods to collect information. With the ongoing digitisation, these procedures have become old fashioned.The digital transformation is changing many business operations at a high speed and a great deal of processes that were executed manually are now accomplished using digital methods.

Technology has had a major impact on how to approach data research and has provided researchers new tools that have transformed and improved data collection and analysis. The pace of change requires companies to be able to react quickly and adapt themselves to changing demands from customers and market conditions.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
Scrumming Down to Complete Projects

Everybody knows about rugby union scrums. For our purposes, perhaps it is best to view them as mini projects where the goal is to get the ball back to the fly-half no matter what the opposition does. Some scrums are set pieces where players follow planned manoeuvres. Loose / rolling scrums develop on the fly where the team responds as best according to the situation. If that sounds to you like software project management then read on, because there are more similarities?.

Isn’t Scrum Project Management the Same as Agile?

No it’s not, because Scrum is disinterested in customer liaison or project planning, although the team members may be happy to receive the accolades following success. In the same way that rugby players let somebody else decide the rules and arrange the fixtures, a software Scrum team just wants the action.

Scrum does however align closely ? dare I say interchangeably with Agile?s sprints. Stripping it of all the other stages frees the observer up to analyse it more closely in the context of a rough and tumble project, where every morning can begin with a backlog of revised requirements to back fit.

The 3 Main Phases of a Scrum

A Scrum is a single day in the life of a project, building onto what went before and setting the stage for what will happen the following day. The desired output is a block of component software that can be tested separately and inserted later. Scrumming is also a useful technique for managing any project that can be broken into discreet phases. The construction industry is a good example.

Phase 1 – Define the Backlog. A Scrum Team?s day begins with a 15 minute planning meeting where team members agree individual to-do lists called ?backlogs?.

Phase 2 – Sprint Towards the Goal. The team separates to allow each member to complete their individual lines of code. Little or no discussion is needed as this stage.

Phase 3 – Review Meeting. At the end of each working day, the team reconvenes to walk down what has been achieved, and check the interconnected functionality.

The 3 Main Phases of a Scrum ? Conclusions and Thoughts

Scrum is a great way to liberate a competent project team from unnecessary constraints that liberate creativity. The question you need to ask yourself as manager is, are you comfortable enough to watch proceedings from the side lines without rushing onto the field to grab the ball.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Ready to work with Denizon?