Why DevOps Matters: Things You Need to Know

DevOps creates an agile relationship between system development and operating departments, so the two collaborate in providing results that are technically effective, and work well for customers and users. This is an improvement over the traditional model where development delivers a complete design ? and then spends weeks and even months afterwards, fixing client side problems that should never have occurred.
Writing for Tech Radar Nigel Wilson explains why it is important to roll out innovation quickly to leverage advantage. This implies the need for a flexible organisation capable of thinking on its feet and forming matrix-based project teams to ensure that development is reliable and cost effective.
Skirmishes in Boardrooms
This cooperative approach runs counter to traditional silo thinking, where Operations does not understand Development, while Development treats the former as problem children. This is a natural outcome of team-centred psychology. It is also the reason why different functions pull up drawbridges at the entrance to their silos. This situation needs managing before it corrodes organization effectiveness. DevOps aims to cut through this spider web of conflict and produce faster results.

The Seeds of Collaboration

Social and personal relationships work best when the strengths of each party compensate the deficiencies of the other. In the case of development and operations, development lacks full understanding of the daily practicalities operating staff face. Conversely, operations lacks ? and should lack knowledge of the nuances of digital automation, for the very reason it is not their business.
DevOps straddles the gap between these silos by building bridges towards a co-operative way of thinking, in which matrix-teams work together to define a problem, translate it into needs and spec the system to resolve these. It is more a culture than a method. Behavioural change naturally leads to contiguous delivery and ongoing deployment. Needless to say only the very best need apply for the roles of client representative, functional tester and developer lead.

Is DevOps Worth the Pain of Change?

Breaking down silos encroaches on individual managers? turf. We should only automate to improve quality and save money. These savings often distil into organisational change. The matrix team may find itself in the middle of a catfight. Despite the pain associated with change resistance, DevOps more than pays its way in terms of benefits gained. We close by considering what these advantages are.

An Agile Matrix Structure ? Technical innovation is happening at a blistering rate. The IT industry can no longer afford to churn out inferior designs that take longer to fix than to create. We cannot afford to allow office politics to stand in the way of progress. Silos and team builds are custodians of routine and that does not sit well with development.

An Integrated Organization ? DevOps not only delivers operational systems faster through contiguous testing. It also creates an environment whereby cross-border teams work together towards achieving a shared objective. When development understands the challenges that operations faces ? and operations understands the technical limiters – a new perspective emerges of ?we are in this together?.

The Final Word ? With understanding of human dynamics pocketed, a DevOps project may be easier to commission than you first think. The traditional way of doing development – and the waterfall delivery at the end is akin to a two-phase production line, in which liaison is the weakest link and loss of quality inevitable.

DevOps avoids this risk by having parties work side-by-side. We need them both to produce the desired results. This is least until robotics takes over and there is no longer a human element in play.

Check our similar posts

4 Reasons Why You Might be Missing Out on Energy Savings…

?well your company actually, although for many small-to-medium businesses it boils down to the same thing. Governments usually lag behind in terms of innovation but are beating us hands-down when it comes to going green. I have heard that private sector energy savings average less than 1% per year and I for one would not be surprised if that were true. So what is causing this rot, when we started out so enthusiastically? Here are four possibilities for you to mull over.

  1. Your Team is Unevenly Yoked ? A pair of mismatched horses cannot pull a wagon in a straight line any more successfully than a business team can achieve its goals, if there is no agreement on priorities. While your sales team may be all for scoring green points against your competition, your accountant has a budget to balance and your operations department just wants to get on with the job.
  1. Energy?s not in Focus ? The above may in part be due to production goals you set your department heads. Energy is not nearly as greedy as raw materials and human capital. If you tell them to cut 5%, where do you think they are going to look first? You need to put energy savings up there, and agree specific targets as you do with other primary goals.
  1. Your Equipment Could be Over-Spec ? It is a very human thing to put more food on our plates and buy faster cars than we need. Only a few generations ago our ancestors lived through feast and famine, and the shadow of this still influences our thinking. Next time you buy equipment sit around the table and agree the decision criteria together. Then stick to them and repel all attempts at up-selling.
  1. You Are Delegating Too Much ? Delegation is part of company culture, or if you prefer the collective way of doing things. If you delegate something completely it is akin to saying I do not care much about this, make it happen. Energy saving is a financial and moral imperative. The fact the oil price is down does not mean there is no place for sustainability on your desk (and the price is likely to be up again soon).

Governments succeed in saving energy (whereas businesses often do not) because governments have a crowd of stakeholders beating down the door and demanding progress. As business owners we are more likely to do the same when the pressure is upon us, and that pressure surely has to come from us.

Job & Staff Scheduling with FieldElite Mobile Service Management Software

Field Service Management (FSM) software systems are designed to enable you to manage your mobile workforce from a central point- and do away with the paperwork involved with the process. They connect your technicians on the ground (via app on their phones), to the staff at the head office- who have an interactive dashboard accessed through their browsers. The office team will have access to all the jobs that are to be handled by the company, simplifying the management process and taking away the risks that come with manual data entry. Here, we will walk you through a quick process of scheduling a job for your personnel with FieldElite.

Say you are a HVAC contractor, licensed, bonded and insured. You’ve made quite a name for yourself in the industry, and have a wide range of clients- in both residential and commercial establishments. Consequently, you also have a large workforce to attend to the different situations- from installing to repair and maintenance. One of your clients- let’s call them ABC Computer Supplies, has an issue with their HVAC unit- perhaps a pipe is leaking. It needs to be fixed, and ABC have booked an appointment.? Your goal here is to get one of your personnel to handle the task as soon as possible, and this field service scheduling software comes in handy.

There are two approaches that you can take:

1. Job Scheduling

From your Dashboard, on the left-hand side you will see the menu option. Clicking on Jobs, will take you to all jobs carried out by your company.

FieldElite

The filters will allow you to view different categories of jobs:

  • Complaint– This means that there was an issue with on ground during the task delivery, and the client lodged a complaint.
  • On hold– Here, different aspects can cause a job to be paused- like when spare parts or equipment required for repair jobs have been ordered, and one needs to wait for them to be shipped in from a different location.
  • Pending– This is basically your in-tray, a list of jobs that are to be carried out.
  • In Progress– The technicians are on the ground, attending to the client’s needs, and you’re getting routine updates from them.
  • Incomplete– Though the job had been assigned to the required technician, it was not completed in the set amount of time, thus requiring an additional visit to the site. Given that the FSM solution increases the first-time fix rate, cases of ?incomplete tasks? are reduced.
  • Complete– The task is successfully done and the customer has appended their e-signature, and now it can be invoiced.
  • Cancelled Invoice– The head office determines that a particular invoice shouldn’t be paid, and thus cancels it.

Our focus here is the pending tasks, so use this filter. ABC’s HVAC job will be among these. Clicking on its Job ID will open up the details of the task, with such an Update Job window:

FieldElite Job

This section contains all the information of the job- both past and present, which you can update in real-time. Any changes will be recorded by the system and can be viewed on the “Audit” tab.

As you can see here, the HVAC repair job is both “pending” and “urgent”. No one really likes sitting in an office that feels like an oven. Being the headquarters, it’s likely handles lots of foot traffic, and the damaged HVAC unit will make the working conditions really difficult. It’s best not to keep the client waiting, right?

So, head on over to the Supervisor and Workers section (on the same “Details” tab), and select the personnel suited for the task.

FieldElite Job Details

Set the time that the task will take for your technician, and once satisfied with the details of the job, click on Update. Voila! You’re done.

FieldElite Job Update

Immediately this happens, the worker received a notification on their app, telling them that they have been assigned the job.

From the app, the technician will be able to view the specifics of the HVAC job, including notes and attachments that you can add directly from your own dashboard, such as schematics of the building and reports from other technicians who installed the air conditioning system for the facility. You also get to add products that will be required for the task- like the pipe and panel mounted socket shown here. As the system also includes an inventory of the products used, their quantity and costs, you will be able to keep an accurate record of the supplies as they as are used.

As such, the field workers will not have to keep coming back to the central office to get documents and reports of new tasks, or walk around with bulky files. When they are carrying out the job, they will also be able to keep the staff at the office updated about its progress, through the chat feature on the mobile app, taking photos and adding notes as required.

2. Staff Scheduling

With this approach, the perspective is basically: ?So I have a couple of jobs- which of my employees has time to handle them?? The FSM allows you to optimise your productivity- by ensuring that you get the most out of the staff work hours, and avoid cases of jobs going into overtime.

Follow these steps:

  1. Select ?Scheduler? from the left-hand side of the window. You will have a view of the workers of your company and how their day is planned out, and a summary of the unassigned jobs.

Here, you can tell whose busy, and who can have a new task assigned to them at the click of a button- which is far more effective than keeping on jotting down points in your diary or going through files of documents.

If the job has yet to be added to the system- like for the cases of new clients, simply click on the ?Add Job? button and key in its details.

2. Scroll down, you will see a list of unassigned jobs.

unassigned jobs

3. Next, click on the edit button under ?Actions?. This will take you to the same ?Update Job? window described in the first approach, in order to assign the preferred worker to the role.

This real-time dispatching avoids cases of your desk getting cluttered with paper sheets, and prevents duplicate entries as each job has its own ID and task details- from the scheduling to the invoicing. In this case, your HVAC technician will have access to the information needed right at the palm of their hand, to ensure that the task at ABC?s head office goes seamlessly. The optimised schedule will enable the task to be carried out faster- restoring normalcy to your client’s facility.? In case the client’s location is on the route that one of your technicians takes while heading home, you can take advantage of this by giving them the task towards the end of their working day- thus clearing more of your backlog, sorting out your client, and easing your technician?s worries about getting home late.

As you can see, the field service scheduling software enables you to easily and efficiently handle your workflow, avoid the mess that is associated with manual documentation and cases of your employees getting conflicting schedules and overlaps- which would strain them and dampen their morale. Streamlining your workflow and standardising operations ultimately results in increased customer satisfaction.

Article 8 of the EU Energy Efficiency Directive ? Orientation

Following in-depth discussion of the UK?s ESOS response, we decided to backtrack to the source, especially since every EU member is facing similar challenges. The core purpose of the directive is to place a pair of obligations on member states. These are

  1. To promote the availability of energy audits among final customers in all sectors, and;
  2. To ensure that enterprises that are not SMEs carry out energy audits at least every four years.

Given the ability for business to look twice at every piece of legislation it considers unproductive, the Brussels legislators took care to define what constitutes an enterprise larger than an SME.

Definition of a Large Undertaking

A large undertaking meets one or both of the following conditions:

  1. It employs 250 or more people
  2. Its annual turnover is more than ?50 million and its balance sheet total exceeds ?43 million

Rules for Energy Audits

If accredited / qualified in-house specialists are unavailable then independent experts should supervise audits. The talent shortage seems common to many EU businesses. In hindsight, the Union could have ramped up slower, especially since the first compliance date of 5 December 2015 does not leave much swing room.

ecoVaro doubts there was a viable alternative, given the urgent imperative to beat back the scourge of carbon that is threatening the viability of our planet. The legislators must have been of a similar mind when laying down the guidelines. Witness for example the requirement that penalties be ?effective, proportionate and dissuasive?.

In order to be compliant, an energy audit must

  1. Be based on twelve months of verifiable data that is
    • over a continuous period beginning no more than 24 months before the beginning of the energy audit, and;
    • identifies energy saving opportunities including paths to their achievement
  2. Analyse the participant’s energy consumption and energy efficiency
  3. Have not been used as the basis for an energy audit in a previous compliance period

Measurement of current status and progress tracing are at the core of energy saving and good governance generally. EcoVaro has a powerhouse of software tools available on the cloud to help project teams save time and money.

Ready to work with Denizon?